THE GREAT DANTON
Nissan 200SX S14A ’99 T H E G R E A T D A N T O N
2012.10.xx – Present
Extracts of all material on this car: The Great Danton
MODIFICATIONS
Powertrain
Engine: SR20DET
Turbo: GT2871R (1.3 bar)
Bottom-End:
ACL Race crank bearings
ACL Race big-end bearings
Apex Performance conrods
Wossner 86.5mm 8:1 pistons
Top-End:
Tomei 256 Poncams intake and exhaust
Custom rocker shims
Cometic 1.1mm head gasket
Apex Performance rocker arm stoppers
Intake:
Front mount intercooler with custom piping
Apexi Power Intake filter
Exhaust:
Garrett GT2871R turbo 0.64AR
XS Power tubular manifold
Japspeed downpipe
3.5″ catback with decat
Fuel:
Walbro 255 fuel pump
Nismo 740cc (JECS) injectors
AEM fuel pressure regulator
Cooling/Fluids:
Billet oil sandwich plate
Thermostatic oil filter relocation block
Mocal oil cooler
Driftworks Supercool alu radiator
Apex Performance braided turbo water & oil lines
Ancillaries:
Apex Performance alu pulley kit
ACT Performance clutch kit
AH Fabrications oil catch tank
Apex Performance short shifter
Electronics:
Apexi PowerFC D-Jetro
AEM Uego AFR
Gizzmo MS-IBC V3 Boost Controller
Suspension
HSD Dualtech Coilovers (FR 8kg, RR 6kg)
Whiteline ARB (Front & Rear)
Apex Steering Rack Bushes
Driftworks Camber Arms
Driftworks Thrust Arms
Driftworks Rear Toe Arms
Driftwork Poly Subframe Bushes
Advan RGIII -15mm Spacers Front
Advan RGIII -10mm Spacers Rear
Toyo R888 GG 245/40
Braking System
Brembo 350Z Front Calipers
Tarox F2000 Front Discs
Ferodo DS2500
EBC Ultimax Rear Discs
Braided Hoses
Chassis
Front Strut Brace
Empty Boot
Removed Rear Seats
Battery in Boot
Driveline
Driftworks Solid Diff Bushes
Differential Radiator Delete
Interior
Personal Neo Grinta Steering Wheel
D1Spec Quick Release
BOSS Hub Kit
RAZO RA 43 Shift Knob
Fire Extinguisher
Modification and development posts in reverse chronological order:
SPLITTER AFTERMATH
V2 PART 23 – Up and Running
V2 PART 22 – Final Engine Prep and FPR
V2 PART 21 – Tuning and Dyno
V2 PART 20 – Final Engine Prep
V2 PART 19 – First Engine Start
V2 PART 18 – Engine Install and Oil Filter Relocation
V2 PART 17 – Rocker Valve Re-shim
V2 PART 16 – Final Engine Build Up
V2 PART 15 – Bottom End Build Up
V2 PART 14.5 – Oil Cooler Install
V2 PART 13 – Bottom End Start and Ancilliaries
V2 PART 12 – Build Start
V2 PART 11.5 – Chassis Prep
V2 PART 11 – Engine Parts
V2 PART 10 – Chassis Prep
V2 PART 9 – Head Disassembly
V2 PART 8 – Bottom End Disassembly
V2 PART 7 – Engine Disassembly Start
V2 PART 6 – Engine Out
V2 PART 4 – Splitter Layout
V2 PART 3 – Further Interior and Mirror Weight Reduction
V2 PART 2 – Interior Weight Reduction and New TurboVersion 2 START